Mahalo Gas Project

HOME E Projects Overview E Mahalo Gas Hub – QLD E Mahalo Gas Project

Mahalo Gas Project

PL 1082 and 1083
PCA 338

Overview:

  • Comet Ridge 100% equity interest and operator.
  • Located in the Dension Trough, approximately 240km west of Gladstone in the southern Bowen Basin.
  • The initial focus for development of the Project will be in the two Petroleum Lease (PL 1082 and PL 1083) areas that were awarded June 2020.
  • The project has been heavily appraised to date, with strong flow rates achieved and reserves independently certified.

Strong project fundamentals:

  • Fully licenced – development ready with Petroleum Leases and environmental approvals granted.
  • Shallow depth – between approximately 180 to 400 metres to target coals (low drilling and completion costs).
  • Permeable coals – Mahalo 7 and Mira 6 short lateral pilot wells flowed between 1200 to 1500 standard cubic feet of gas per metre of coal intersected.
  • Very low water production – resulting in lower capex and opex.
  • No coal or clay fines production – reducing workover opex.
  • High gas quality – pipeline spec gas and almost no CO2 (measured at only 0.05%).
  • Close to infrastructure – approximately 80km connection to GLNG and Jemena pipelines to Gladstone.

Gas Reserves and Resources – Comet Ridge’s 100% interest in Mahalo Project Gas Reserves and Contingent Gas Resources at 30 June 2025 is shown in Table 2 below.

Acquisition & Development – Comet Ridge announced to the market on 15 December 2025 that it had reached an agreement to acquire Santos QNT Pty Ltd’s 42.86% interest in the Mahalo Gas Project, taking Comet Ridge ownership to 100% upon completion. The transaction was formally completed 24 August 2026. Comet Ridge now has 100% control of the decision-making process for development timing, sequencing and infrastructure and is optimising the project economics based on 100% ownership and in combination with our adjacent assets. Comet Ridge is currently reviewing and optimising the Front-End Engineering Design (FEED) for the Mahalo Gas Project by integrating Comet Ridge’s 100% owned Mahalo North and Mahalo East assets towards a Final investment Decision (FID)

Pipeline – Jemena Queensland Gas Pipeline (1) Pty Ltd and Jemena Queensland Gas Pipeline (2) Pty Ltd(collectively, Jemena) has completed the technical work for the FEED for construction of a new10-inch diameter high pressure natural gas pipeline and the Queensland Government has formally awarded Jemena a Point-to-Point Petroleum Pipeline Licence (PPL) for the transport of natural gas from the Mahalo Gas Hub in Central Queensland, to connect into two major natural gas transmission pipelines to the south (see Figure 3). These supply to both domestic and international LNG markets

Comet Ridge

ABN 47 106 092 577

Level 12, 410 Queen Street
Brisbane QLD 4000

GPO Box 798
Brisbane, QLD 4001

+61 7 3221 3661